For operators who already have hardware hashing but suspect breaker trips or uneven phase loading, this audit maps every PDU circuit against actual wall draw.
Deliverables
- Phase balance report across all three legs
- THD measurements at the main panel
- Revised PDU schedule with recommended breaker upgrades
- Red-line markup of existing floor plan showing overloaded bays
Typical Findings
Mixed batches of S19 and M50 units on the same PDU often create 15–20% phase imbalance. We specify which units to move to which bay to flatten the load without downtime exceeding four hours per row.